Building Near Trees in Boroondara

Tree protection fencing around a mature eucalypt next to a timber house frame under construction

Tree and arborist guidelines for planning applications and construction.

If you are planning a new house, extension, townhouse development, pool, driveway or retaining wall in Boroondara, identify the tree constraints before the design is locked in. Trees on your site, next door or on Council land can affect where and how you build.

This guide explains which trees to consider, when arborist reports are useful, how Boroondara’s controls interact and what happens when construction approaches a retained tree. It is written for homeowners, architects, designers and builders.

  • AQF Level 5 Consulting Arborists
  • QTRA & TRAQ Qualified
  • 32+ Years’ Experience
  • Council Pathway Checked First
Tree protection fencing around a mature eucalypt next to a timber house frame under construction

Get the Right Advice Before You Build

Send your site address, survey and proposed plans to our AQF Level 5 Consulting Arborists. We can identify tree constraints, advise which reports or investigations are needed, and work with your architect, planner and engineer before the design is locked in.

Get a Free Quote

Explore the services for your project

Before You Lodge

Do I need an arborist before lodging plans with Boroondara Council?

Not every proposal needs an arborist report. If trees could be affected, establish the tree constraints and reporting requirements before lodging. Council’s construction guidance recommends qualified arborist advice on design, protection and supervision, with reports prepared to its reporting guidelines.

Early assessment can reveal a conflict while the architect and engineer still have room to change the design. A tree retained on a drawing may need substantial consideration if excavation, services or access enter its root zone.

Need the actual report? See Planning Permit Arborist Reports Boroondara for Arboricultural Impact Assessments and planning documentation.

How can trees affect a development?

  • Building position

    The footprint, setbacks and separation from retained trees.

  • Excavation

    Basements, pool shells, shoring and retaining-wall footings.

  • Driveways and access

    Crossovers, pavement levels and machinery routes.

  • Stormwater and services

    Sewer, drainage, water, electricity and communications.

  • Construction method

    Demolition, temporary works, storage and ground protection.

  • Retention and planting

    Which trees can remain and where future trees can grow.

Which trees could be affected?

Consider trees on-site, on neighbouring properties and on adjoining Council land. Include trees beside trenches, retaining walls and construction access, even where they stand clear of the finished building. Roots can extend beyond the canopy. Assess the whole construction footprint, including work outside the final walls.

  • On your site
  • Neighbouring properties
  • Adjoining Council land

Boroondara’s Local Tree Controls

2m
Structural Root Zone the Local Law defines around a canopy tree
110cm
Trunk circumference, measured 1.4 m along the trunk, that makes a Local Law canopy tree
150cm
Trunk circumference at ground level, the alternative canopy tree test
5m
Minimum height of an existing canopy tree under Clause 52.37, with a 4 m average canopy diameter
01

Can you build within two metres of a tree?

For a protected Local Law canopy tree, works within the two-metre zone require a permit unless an applicable exception applies. Permission is not automatic. Significant trees have a separate protection-zone control.

02

What counts as a Local Law canopy tree?

Boroondara’s Tree Protection Local Law 2024 defines a canopy tree by a trunk circumference of at least 110 cm measured 1.4 m along the trunk from ground level, or 150 cm at ground level. For multi-stemmed trees, the relevant trunk circumferences are added. Trees previously assessed as canopy trees under the earlier Local Laws can also remain covered.

The Local Law defines a two-metre Structural Root Zone around a canopy tree. This is a statutory definition; it is not a substitute for the arborist’s assessment of structural roots and construction impacts.

03

What about significant trees?

Check Council’s Significant Tree Register and mapped protection information. Local Law permits control removal, pruning and works within a significant tree’s TPZ. Protection can affect neighbouring private land as well as the property containing the trunk.

04

Does staying more than two metres away make building safe?

No. Roots and relevant protection zones can extend well beyond two metres. Excavation outside that distance can still damage a protected tree, affect its stability or conflict with planning requirements and permit conditions. The two-metre test answers one permit question; it does not establish an acceptable excavation line.

05

Which planning controls also need checking?

Check the current Boroondara Planning Scheme, the property’s zone, applicable overlays and existing permit conditions. Overlay requirements are property-specific. Do not assume every property in a suburb has the same controls.

Under current Clause 52.37, an existing canopy tree is at least 5 m high with an average canopy diameter of at least 4 m. Boundary canopy trees have trunk locations within 6 m of the narrowest street frontage or 4.5 m of the rear boundary. The zone, development pathway and applicable exceptions determine the permit requirement.

The planning definition and the Local Law circumference test are separate. A tree below the Local Law size threshold can still require planning assessment. A planning exemption does not automatically settle the Local Law requirements.

Reports and Root Zones

What is a development arborist report, and what is an AIA?

Development arborist report

A development arborist report provides the tree information relevant to the proposal. It records species, dimensions, health, structure and retention value, and explains proposed retention, removal and protection requirements.

Arboricultural Impact Assessment (AIA)

An Arboricultural Impact Assessment (AIA) focuses on the interaction: where excavation enters root zones, whether pruning is feasible and whether a design or construction method could reduce impacts. It should explain the arboricultural reasoning behind the recommendations.

The aim is to establish how the development and trees can coexist, and identify genuine conflicts requiring a decision. Current survey, architectural and relevant engineering plans are essential.

What are the NRZ, TPZ and SRZ?

Technical tree protection assessment is undertaken with reference to AS 4970:2025, Protection of trees on development sites. It uses three related terms:

  1. NRZ

    Notional Root Zone

    A calculated starting area, generally a radius of 12 times the trunk diameter at standard height. It is the first estimate of where important roots may be.

  2. SRZ

    Structural Root Zone

    The roots and soil most important to the tree's stability.

  3. TPZ

    Tree Protection Zone

    The project-specific protection area the arborist establishes from the NRZ, the tree's condition, site conditions and the proposed construction method. It informs controls on excavation, fill, compaction, storage, vehicles and services.

The arborist considers tree condition, existing structures, rooting conditions and construction methods. Keep these technical assessments distinct from defined terms in Council’s Local Law. The Local Law's two-metre Structural Root Zone is a separate statutory definition.

Does building inside a TPZ mean the tree must be removed?

No. Encroachment needs assessment; it does not automatically justify removal. Its extent and location, the tree’s condition, root distribution, previous disturbances and the proposed method all matter. Root investigation or a revised footing arrangement may provide a workable response.

Diagram showing a tree trunk, its Structural Root Zone and calculated Notional Root Zone, with the part of the root zone overlapped by proposed building and excavation shaded
Illustrative only - not to scale. The circle shows a calculated Notional Root Zone (NRZ); shading shows its overlap with proposed excavation. The project TPZ is set by site-specific arboricultural assessment. This is not an approved building layout or tree protection plan.

Roots, Neighbours and Street Trees

When is root investigation useful?

Root investigation is useful when actual root locations could change a design decision. Plans and formulas identify where a conflict may occur; they do not reveal every root.

Careful non-destructive investigation, including AirSpade excavation where suitable, can establish root presence, size, depth and direction along a proposed footing, wall, driveway or excavation line. The results may support moving piers, bridging roots or relocating a trench.

Investigation can also show that the proposed works would cause unacceptable damage. It provides evidence for the decision and does not guarantee permission to build closer. See Tree Root Investigation Boroondara.

Can a neighbouring tree affect my development?

Yes. A tree does not stop being relevant at the boundary. Roots and canopy may extend from neighbouring gardens, strata land or adjoining reserves into the works. Identify relevant trees early and explain any access or measurement limitations in the report.

For a boundary excavation, assess shoring, footing depth and service routes as well as the finished wall. Resolve access and ownership permissions separately; development approval should not be assumed to authorise work on another owner’s tree.

Can a Boroondara street tree affect my driveway crossover?

Yes. Council’s vehicle-crossing guidance requires a crossing to be at least 2.5 m from the exposed base of street trees. The site plan must identify street trees and distances to the crossing. Council may require a revised position after inspection.

That minimum separation does not establish that all roots are clear of excavation. Consider pavement depth, edge beams, changes in level, compaction and access. Discuss the crossing with Council before relying on a street tree being removed or relocated.

Can root mapping help me build closer to a tree?

Sometimes. A changed footing position or construction method may avoid significant roots. Where investigation identifies important roots across the proposed excavation, a greater setback or a different layout may be needed. The arborist and engineer should interpret the findings together.

What if a retained tree appears unhealthy or unstable?

Assess its condition before committing to a design that relies on retaining it. Tree risk or diagnostic investigation may be appropriate where defects, decay or root damage are suspected. See Tree Risk Assessment Boroondara.

Construction Conflicts

Where do trees and construction commonly conflict?

Assess the actual construction impact, including temporary works. A building may sit outside a root zone while the excavation needed to construct it extends inside.

  • Basements, pools and excavation

    Allow for excavation depth, over-dig, shoring, piling rigs and construction access. A plan view alone may conceal a substantial below-ground conflict.

  • Driveways and access

    Impacts can come from pavement excavation, edge beams, changes in levels, vehicle loading and repeated machinery movement. A driveway described as permeable still needs a tree-sensitive installation method.

  • Retaining walls and soil levels

    Cutting can sever roots. Filling can alter aeration and drainage around them. Check wall footings, drainage trenches and the ground levels on both sides.

  • Stormwater and service trenches

    A narrow trench can sever multiple roots along a continuous line. Coordinate sewer, stormwater, water, gas, electricity and communications. Where suitable, assess alternative routes or boring with appropriately located entry and exit pits.

  • Demolition and site establishment

    Removing slabs, clearing access and positioning machinery can damage roots before the new building starts. Protection needs to cover demolition and temporary access, not just the main construction stage.

How does this apply to Boroondara projects?

For a rear extension in Camberwell or Canterbury, assess boundary trees alongside footing and drainage layouts. On a townhouse site in Balwyn or Kew, coordinate retained trees with basements, driveways and planting space. For sloping land in Kew East or Balwyn North, examine excavation depths, retaining walls and level differences wherever those conditions occur.

These are design scenarios, not claims about completed projects. The actual property, tree survey and plans determine the assessment.

Design around trees before lodgement

Consider moving part of the footprint, relocating piers, changing excavation or footing design, bridging roots, revising retaining walls or moving services. Small coordinated changes can sometimes resolve a conflict before the planning application is prepared. An arborist’s recommendation must also work with engineering and other planning requirements.

Sloping back yard with numbered tags on established eucalypt trunks and pink survey pegs in the lawn beside a brick home (illustrative image)Illustrative image only. Not a photograph of this project.

Kew East: Elm Grove (Arboricultural Impact Assessment)

A residential development needed assessment of 15 established trees, including two Sugar Gums of about 18 m and 20 m and vegetation on adjoining properties. The report recommended retaining and protecting 12 trees, removing three lower-value trees, protection fencing, consideration of neighbouring trees and Project Arborist supervision where relevant.

Why it is relevant: large established eucalypts and neighbouring trees are exactly the constraints to identify before the design is fixed.

Report prepared by Alex de Jong and Matthew Bunting-Frame.

This summarises our report's recommendations. It does not claim a Council decision or completed works.

Planning and Construction

What if tree removal forms part of the development?

Assess removal through the correct planning and Local Law pathways before work begins. A development report should explain tree retention value, proposed impacts and reasonable alternatives. It supports the application; it does not guarantee approval.

Where replacement planting is required, follow the permit conditions. Do not assume a universal replacement ratio or remove a tree in advance to simplify the development application. See Tree Removal Boroondara.

Canopy cover, deep soil and basements

Identify the residential planning provisions applying to the proposal, including Clauses 54, 55 or 57 where relevant. Calculate canopy and deep-soil requirements under the applicable provisions, rather than applying a single figure to every project.

Coordinate mature planting size, rooting space, basements, services and paved areas. A landscape symbol above a basement slab does not itself provide deep soil. Retained trees and future planting need room to remain viable.

During construction: Tree Protection Plans and Project Arborists

A Tree Protection Plan (TPP) translates the assessment into site controls: fencing, ground protection, access restrictions, supervision points and permitted methods. A Project Arborist carries out the involvement required by the consent or project, including inspections, supervision and reporting.

Council’s construction guidance calls for protection before work starts and throughout construction. Its listed restrictions cover activities such as material storage, cement-product preparation, washdown and refuelling in the TPZ. Read the project-specific permit and protection plan.

Two practical rules: if the design changes, check whether the arborist report needs updating. If significant roots are exposed, pause the affected work and seek advice before cutting them.

The correct sequence

  1. Obtain the current survey, architectural and relevant engineering plans.

  2. Identify on-site, neighbouring and Council trees that could be affected.

  3. Check the controls and assess tree condition, retention value and root zones.

  4. Resolve conflicts through design coordination or root investigation.

  5. Lodge coordinated documents, then read the permit and endorsed plans.

  6. Install protection and arrange the required Project Arborist involvement.

Before you lodge, send us your plans

Send the site address, survey, architectural and relevant engineering plans, Council correspondence and any previous arborist documentation. Early review gives the team more opportunity to identify conflicts before they become redesign or construction issues.

What Our Clients Say

Google reviews from Arbor Express clients.

“Robert and Arbor Express were very helpful and professional in helping me deal with identifying a large dangerous tree which needed to be removed. I highly recommend Arbor Express.”

Ian BlatchGoogle review for Arbor Express

“Alex and his team helped me finalise my DA by doing root mapping and an arborist report. Alex exemplifies quality, and I loved his work so much I will have him as my project arborist for my build.”

E. P.Google review for Arbor Express

“Thank you Arbor Express! Alex and Rob were able to deliver a high quality arborist report in a timely manner that received council approval. Would highly recommend!”

Arthur BoardmanGoogle review for Arbor Express

“Very quick, efficient and thorough. Arbor Express filed the report directly with our local Council, fees included, which meant we could have the dangerous tree removed within a week. Well worth the money.”

Annette GreerGoogle review for Arbor Express

“Robert was easy to deal with, arrived at the appointed time and provided a completed report within days of the initial inspection. Excellent service.”

Linda NoyceGoogle review for Arbor Express

“I am very happy to provide a review of Arbor Express. I was very happy with Robert’s work and the comprehensive report he provided. Thank you Robert and team.”

Murray RankinGoogle review for Arbor Express

“Very quick and professional service. They even offered to provide a report over the Easter holiday, so impressive commitment to customer service.”

Paul SidwellGoogle review for Arbor Express

“Arbor Express provides professional reports and follow up advice. Their friendly attitude makes understanding the process regarding neighbourhood disputes easy. Highly recommend”

Stacey SouthGoogle review for Arbor Express

“A complex matter involving several large council-owned gum trees adjacent to my property … his advice was balanced and evidence-based, and the report was not exaggerated or one-sided.”

J WGoogle review for Arbor Express

Frequently Asked Questions

How close can I build to a tree in Boroondara?

There is no universal safe distance. Check the Local Law works triggers, planning controls and the tree-specific arboricultural assessment. Staying outside two metres does not establish that excavation is acceptable.

Does every Boroondara Council planning application need an arborist report?

No. Requirements depend on the site, trees and proposed works. If trees could be affected, confirm the necessary assessment before lodging.

Does a neighbouring tree need to be included?

Yes, where its roots, canopy or protection requirements interact with the proposal. Explain limitations if access for inspection or measurement is unavailable.

Does TPZ encroachment mean removal will be approved?

No. The impact and alternatives require assessment. Council considers the applicable controls and evidence; encroachment alone does not establish a case for removal.

Can I cut roots found during excavation?

Do not assume so. Pause work affecting significant roots and obtain arboricultural advice, with particular attention to retained-tree permit conditions and stability.

Can the architect design the house before the arborist is engaged?

Yes, but significant trees can create avoidable redesign if their constraints are discovered late. Preliminary arboricultural advice is most useful while the design can still change.

Does a building permit authorise work near protected trees?

Do not assume it does. Establish the applicable planning and Local Law requirements and comply with the relevant approvals before starting.

What is the difference between the planning arborist and Project Arborist?

The planning assessment addresses the proposed impacts and recommendations. The Project Arborist provides the required involvement during demolition and construction.

Can you work with my architect, planner and engineer?

Yes. We provide arboricultural advice to coordinate tree retention, building position, footings, excavation and construction methods.