The Boroondara Planning Scheme contains five Significant Landscape Overlay schedules, SLO1-SLO5, for river and creek corridors. A schedule applies only where the planning map identifies it. Tree removal, vegetation works, buildings and fences may need approval under the relevant schedule and its exemptions.

The schedules cover different waterway reaches. Their titles describe the wider corridors; they do not mean that every property near a named creek, or throughout a suburb, is affected. We check the mapping for your address before advising.

  • AQF Level 5 Consulting Arborists
  • QTRA & TRAQ Qualified
  • 32+ Years’ Experience
  • Fast-Track Report Turnaround
Large plane tree beside a tall hedge and a red-brick period home with a slate roof

Does the SLO Apply to My Property?

Overlays are mapped to individual properties, not whole suburbs. Check your address on VicPlan or in a planning property report, and note the schedule number shown.

Which SLO Schedule Applies?

SLO2 (Merri Creek) and SLO3 (Darebin Creek) appear in the Boroondara Planning Scheme, but both creeks lie outside Boroondara. Boroondara addresses are far more likely to be affected by SLO1 (Yarra River), SLO4 (Koonung Creek) or SLO5 (Gardiners Creek). Check VicPlan for the schedule mapped to your address.

ScheduleOfficial landscape or waterway titleTree and vegetation assessmentOfficial source
SLO1Yarra (Birrarung) River Corridor EnvironsVegetation removal generally requires a permit, subject to the schedule and parent-clause exemptionsSchedule 1 to Clause 42.03
SLO2Merri Creek Reach 3 - Broadmeadows to Birrarung Confluence, Clifton HillApply only on land mapped SLO2; check the vegetation exemptionsSchedule 2 to Clause 42.03
SLO3Darebin Creek Reach 4 - Darebin Parklands, Alphington to BirrarungApply only on land mapped SLO3; check the vegetation exemptionsSchedule 3 to Clause 42.03
SLO4Koonung Creek (Koonung Koonung)Apply only on land mapped SLO4; check the vegetation exemptionsSchedule 4 to Clause 42.03
SLO5Gardiners Creek (Kooyongkoot)Apply only on land mapped SLO5; check the vegetation exemptionsSchedule 5 to Clause 42.03
01

Key Vegetation Exemptions

SLO1 includes an exemption for non-native vegetation only where all three size tests are met: height below 6 m, trunk circumference below 0.35 m measured at 1.4 m, and branch spread below 4 m. Its limited pruning exemption covers dead or broken branches, or branches below 50 mm at the attachment, provided no more than one-third of foliage is removed; it excludes the trunk.

SLO2-SLO5 include a small-vegetation exemption only where all three tests are met: height below 6 m, trunk diameter below 0.4 m measured at 1.4 m, and canopy diameter below 4 m. The schedules also address vegetation planted as a windbreak, plantation, orchard or horticulture, listed environmental weeds, and specified public-authority or land-management works.

The SLO1 test uses circumference; the SLO2-SLO5 test uses diameter. They are not interchangeable. The parent clause also contains exemptions, including narrowly defined emergency works. Other tree controls must still be checked.

02

Buildings, Works and Fences

The schedules have different building, works and fence tests. For example, SLO1 addresses certain fences within 30 m of the river or abutting public open space; SLO2-SLO5 contain waterway setback and other conditions. Check the complete schedule for your zone and proposal rather than applying one corridor's rules to another.

What Makes an SLO Different

An SLO protects the character of a landscape as a whole: how trees, vegetation, topography and buildings combine, including views along and across the waterway. Council assesses whether works or tree removal undermine that character, not just the value of a single tree.

How an SLO Affects Development

Building siting, height and vegetation loss can be assessed against the relevant waterway landscape objectives. Development may need an Arboricultural Impact Assessment, Tree Protection Plan and landscape information showing how the proposal responds to it.

Other Boroondara Tree Controls Still Apply

An overlay operates alongside Boroondara's Tree Protection Local Law, the Significant Tree Register and Clause 52.37. A tree can be caught by several controls; we confirm which ones apply and the right approval pathway.

How We Help

  • Development: Arboricultural Impact Assessments and Tree Protection Plans that respond to the overlay schedule.
  • Tree removal: permit evidence and, once approved, professional removal.

Who Prepares Your Report?

Our Boroondara reports are prepared by the Arbor Express consulting team, led by Robert de Jong, Principal Arborist (Diploma of Arboriculture, AQF Level 5; QTRA Qualified Practitioner; 32+ years in arboriculture). The team includes Director Alex de Jong (AQF Level 5) and arborists Matthew Bunting-Frame and Patrick Mortell. Each report names the arborist responsible for it. We also carry out professional tree removal and pruning. Fast-track refers to our report turnaround; Council assessment times are set by Council.

About our company

What Our Clients Say

Google reviews from Arbor Express clients.

“Robert and Arbor Express were very helpful and professional in helping me deal with identifying a large dangerous tree which needed to be removed. I highly recommend Arbor Express.”

Ian BlatchGoogle review for Arbor Express

“Alex and his team helped me finalise my DA by doing root mapping and an arborist report. Alex exemplifies quality, and I loved his work so much I will have him as my project arborist for my build.”

E. P.Google review for Arbor Express

“Thank you Arbor Express! Alex and Rob were able to deliver a high quality arborist report in a timely manner that received council approval. Would highly recommend!”

Arthur BoardmanGoogle review for Arbor Express

“Very quick, efficient and thorough. Arbor Express filed the report directly with our local Council, fees included, which meant we could have the dangerous tree removed within a week. Well worth the money.”

Annette GreerGoogle review for Arbor Express

“Robert was easy to deal with, arrived at the appointed time and provided a completed report within days of the initial inspection. Excellent service.”

Linda NoyceGoogle review for Arbor Express

“I am very happy to provide a review of Arbor Express. I was very happy with Robert’s work and the comprehensive report he provided. Thank you Robert and team.”

Murray RankinGoogle review for Arbor Express

“Very quick and professional service. They even offered to provide a report over the Easter holiday, so impressive commitment to customer service.”

Paul SidwellGoogle review for Arbor Express

“Arbor Express provides professional reports and follow up advice. Their friendly attitude makes understanding the process regarding neighbourhood disputes easy. Highly recommend”

Stacey SouthGoogle review for Arbor Express

“A complex matter involving several large council-owned gum trees adjacent to my property … his advice was balanced and evidence-based, and the report was not exaggerated or one-sided.”

J WGoogle review for Arbor Express

Frequently Asked Questions

Does every tree in an SLO need a permit?

No. The applicable schedule and the parent clause set the exemptions. We check the tree, proposed work and mapped control together.

Does an SLO apply to every property near a river or creek?

No. Only mapped land is affected. A planning property report identifies the schedule for your address.

Can you assess development near Gardiners Creek or Koonung Creek?

Yes. We check whether SLO5, SLO4 or another control applies and prepare the relevant tree impact assessment and protection plan.

Can I prune a tree in SLO1 without a permit?

Only within the schedule's limited exemption: dead or broken branches, or branches below 50 mm at the attachment, removing no more than one-third of the foliage and never the trunk. Other pruning generally needs a planning permit. Boroondara's Local Law pruning rules still apply separately.

Do I need both an SLO permit and a Local Law permit?

Often, yes. The SLO is a planning control and the Local Law is a separate Council law. A tree can need a planning permit, a Local Law permit, or both. We identify every approval before work starts.

Need Help With a Boroondara Tree?

Send your plans for a report quote, or tree photos for a preliminary permit check.

Call NowGet a Free Quote